Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
NYK
Location
Canary Wharf
Timeframe
12 weeks
Project Overview
Set on the 19th floor of a high-rise in Canary Wharf, this 12-week fit-out for an international shipping company, NYK, created a high-end reception area and office space that made an immediate impression. The standout feature was a bespoke solid surface reception desk, paired with a striking reception wall that created a dramatic entry point. From the detailed wall veneering to the fully customized library and tea points, the project was designed to balance functionality and aesthetic appeal. Despite the challenges of fabricating the complex reception desk, the final result achieved a true wow factor for all who enter the space.
Favourite Moment
Our favourite piece from this project was the bespoke reception desk. Its bold design and central position in the room make it a statement feature that sets the tone for the rest of the office.
Challenges Faced
The most challenging part of the project was the fabrication of the reception desk. Its complex shape and solid surface material required a high level of craftsmanship and attention to detail to ensure a flawless finish that matched the sleek aesthetic of the office.
Final Thoughts
This project truly transformed the 19th floor into a stunning workplace with a dramatic reception area that serves as the perfect introduction to the office. The combination of bold design choices, like the blue fluted panel and solid surface desk, with subtle, elegant details like the textured sheet metal displays and oak worktops, creates a space that is both functional and visually striking. We were proud to be part of this transformation, and the final result left a lasting impression on everyone involved.